LBJ Beam Coating Operations
| Safety Item Description | Status | Photo / Attachment Ref. | Comments |
|---|
Select a beam to enter its active workspace and perform the specific tests.
Statistical Summary Narrative
Work was observed at beam(s). The primary work activities included . Safety/JHA/PPE/TCP documentation was . Environmental conditions were . Coating application and/or crack repair work was .
Upon clicking "SUBMIT REPORT", the system will generate the official A4 PDF, download it locally, and automatically dispatch it by email to the mailing list.
| Crack ID | Bridge | Beam | Location | Max Width (mils) | Length | Required Treatment | Material Used | Before Photo Ref. | Status | Action |
|---|
| Crack Location | Crack Width | Required Action |
|---|---|---|
| Vertical face / web / flange | Up to 10 mils | Primer + elastomeric coating only |
| Vertical face / web / flange | 10-40 mils | Surface crack sealing with SikaQuick VOH |
| Vertical face / web / flange | Greater than 40 mils | Notify LBJIG: Crack injection only after approval |
| Pourback | 10-15 mils | Surface sealing with SikaQuick VOH |
| Pourback | Greater than 15 mils | Surface sealing with CrackBond 2100 MV |
| Pourback | Any width | No crack injection permitted |